Stamping Press Downtime Analysis
Stops are captured from the machine rather than logged after the fact, and the operator names the reason at the press while it is still fresh. Each reason carries duration, share of total downtime and occurrence count together, which is what makes Pareto prioritisation possible without exporting anything. The same record then re-reads seven ways: by state, by reason, by asset, by tool, by product, by department and by operator. Selections compose, so two reason codes can be isolated and then re-pivoted by operator.
- Capture
- From the machine, automatically
- Classification
- Operator names the reason at the press
- Reason codes
- Configurable master list
- Each row carries
- Duration, share, occurrence count
- Pivots
- State, reason, asset, tool, product, department, operator
In the product
Ranked by duration, with share and occurrence count on the same row. The tabs re-read the same data.
- Power supply not available41h 23m18.9% · 16 stops
- Coil loading22h 56m10.5% · 145 stops
- Breakdown analysis17h 16m7.9% · 149 stops
- Adjusting the setup15h 53m7.2% · 172 stops
- Tool breakdown15h 28m7.1% · 27 stops
What it does
- Automatic capture
- Every state change is timestamped and recorded without anyone writing it down.
- Reason at the machine
- The operator classifies the stop on the panel already in front of them.
- Pareto ranking
- Duration, share and count on one row, ordered so the biggest loss is first.
- Seven pivots
- The same data re-reads by state, reason, asset, tool, product, department or operator.
- Composable filters
- Isolate two reason codes, then re-pivot by operator without leaving the view.
- Planned and unplanned split
- Scheduled downtime is separated from the losses that matter.
How it works
Detect the stop
The machine state changes and the clock starts, with no human involvement.
Name the cause
The operator selects a reason and can add a note.
Rank and pivot
Reasons order by duration, then the same set re-reads by any dimension.
Who this is for
- A plant that knows total downtime but not its distribution.
- A shop arguing about whether coil loading or tool breakdown costs more.
- A maintenance head who needs occurrence counts, not just hours.
Questions
- Does an operator have to log every stop?
- The stop is captured automatically. The operator only supplies the reason.
- Can we add our own reason codes?
- Yes. Reasons are a master list you maintain.
- Can we see downtime for one tool across all presses?
- Yes, by pivoting the same record by tool.
- Is planned downtime counted against us?
- No. Planned and unplanned are recorded separately.